Direct stick is a method by which the timber is stuck directly to the concrete.

It  is important that a suitable moisture barrier such as Epicrete  is used on new concrete slabs.

The door frames are cut at the base to enable the boards to slide in the gap enabling a neat finish leaving no gaps.

The concrete floor is then scraped to remove loose particles, vacuumed and a moisture barrier is applied when necessary.

A string line is fitted to ensue that the boards are straight. Then the glue is applied to the floor in manageable sections.

The timber is then laid in the bed of glue, fixing the first board in accordance with the string line.

The remaining boards are the clamped, checked for straightness and then fixed in position using galvanised concrete nails.

A process of tapping the floor lightly to determine hollow points is also used to obtain the best results.

Trims are then installed along the walls allowing a small gap between the board and the wall to prevent any movement.

This process is then repeated throughout the determined area until finished.

Note "The timber should be allowed to sit for at least 10 days prior to the sealing process to enable the timber to stabilise"

Gallery

          Phone / Fax  :  +61 (08) 9337 7700        Email :  info@westcoasttimberflooring.com       234 Carrington Street Hilton

          Mobile         :   0414 096 847                                      Phillip R Veale                                  Western Australia 6163

American White Oak  Anagre  Bamboo  Brushbox  Bleckbutt WA  Blackbutt NSW  Cypress Pine  Iron Bark  New Jarrah  Recycled Jarrah  Karri  Kempus  Keruing  Makore  Marri  Membatu  Merbau  Myrtle  Red Mahogany  Rosegum  Sheoak  Southern Bluegum  Spotted Gum  Sydney Bluegum  Tallowood  Tasmanian Oak  Teak  Tuart  Victorian Ash